
System ALV – time delayer for start and stop
Indispensable for anyone who, along with a circular saw, planer, belt grinder, or piercing saw, would also like to operate a vacuum device, vacuum cleaner, etc. without surge overloading the fuse. With the work machine switched on, the second appliance switches itself on automatically after two to three seconds. This prevents in-house fuse overloading. As required by the hazardous material ordinance, the vacuum device runs for three to four seconds extracting the rest of the dust after the work machine is switched off.
The start time delayer does not limit the consumer’s starting current.
ALV1 / time delayer for start and stop / 230V
For direct plug in 230V plug.
Socket delayed:
AC-1: 230 V / 10 A
AC-3: 230 V / 4 A
min. 100W (threshold), max. 230V / 16A / 3600W
ALV2 / time delayer for start and stop / 230V
With 4m line in cable.
Socket delayed:
AC-1: 230 V / 10 A
AC-3: 230 V / 4 A
min. 100W (threshold), max. 230V / 16A / 3600W
ALV10 / time delayer for start and stop / 400V
400 V
1 x master CEE 3P+N+E, 16A, 6h
1 x salve CEE 3P+N+E, 16A, 6h
230V:
1 x master Schuko socket 2P+E
1 x salve Schuko socket 2P+E
Connected power total:
min. 100W (threshold), max. 400V / 16A / 11000W
Socket delayed:
AC-1: 230V / 400V / 16A
AC-3: 230V / 13,5A / 3KW
AC-3: 400V / 9A / 4KW
ALV20 / time delayer for start and stop / 400V
400 V
3 x master CEE 3P+N+E, 16A, 6h
1 x salve CEE 3P+N+E, 16A, 6h
230V:
1 x master Schuko socket 2P+E
1 x salve Schuko socket 2P+E
Connected power total:
min. 100W (threshold), max. 400V / 16A / 11000W
Socket delayed:
AC-1: 230V / 400V / 16A
AC-3: 230V / 13,5A / 3KW
AC-3: 400V / 9A / 4KW
Contact us
You have any questions? Contact us, we will be happy to help you find your best solution!
A standard selection of our switches you will find in onlineshop
Other solutions


